Building of Loch Hillan
From its inception, the Club has faced the problem of a lack of reliable, good-quality water.
During the early years, several water bores were sunk, but their salt content proved to be too high.
David Hillan planned all aspects of the storage scheme, including using the material from the Dam to provide filling for the 7th hole and landscaping the dam area.
The Bridge
The “Bridge” was an integral part of the project and volunteer members worked tirelessly to build it, bucketing concrete and erecting rail supports and welding.
A difference of nine inches between the two sections was solved by using rope to gradually pull the two sections of steel together before welding them.
The Bridge was officially opened on 13 January 1980.